The state's umbrella industrial policy — 21 thrust sectors, a revised MSME definition, and a pick-your-own mix of capital subsidy, interest subsidy and power tariff support scaled by taluka category, from micro units to ultra-mega projects.
Subsidies & Schemes
Government of Gujarat · Industries & Mines Department
The schemes Gujarat offers, read properly.
The state schemes we file against, summarised and kept together in one place. Every summary is drawn from the notified document, and the document itself is a click away.
- On the shelf
- 6
- Currently open
- 4
- Lapsed
- 2
Section 01
The Shelf
Each entry carries the notified reference, the operative period where the document states one, and the original PDF.
Three tiers of assistance — MSME, Large & Thrust Sector, and Mega — covering interest subsidy, net SGST reimbursement, EPF reimbursement and capital support, sized by taluka category.
An integrated policy across the textile value chain — capital and interest subsidy, ₹1/unit power tariff support, and per-worker payroll assistance, with an enhanced package for labour-intensive units.
Assistance Scheme · 2020
Scheme for Financial Assistance to Industrial Parks
GR No. GID-102020-324968-G · 1 September 2020
Capital assistance of 25% — 50% in Vanbandhu talukas — toward the infrastructure cost of developing an industrial park, plus worker housing support and full stamp duty reimbursement.
State Policy · 2021
Gujarat Integrated Logistics and Logistics Park Policy 2021
GR No. GID-102021-560-I-1 · 31 July 2021
The state's dedicated logistics policy — eight incentives spanning capital and interest subsidy, stamp duty, electricity duty, patents, quality certification, skilling and technology, across ten classes of logistics facility.
The notified five-year window closed on 1 August 2026. Confirm with us whether a successor notification is in force before planning around it.
Assistance Scheme · 2020
Scheme for Assistance to Logistic Park
GR No. GID-102020-325568-G · 1 September 2020
Capital assistance of 25% toward the infrastructure cost of a logistics park of 20 hectares or more, capped at ₹15 crore, with full stamp duty reimbursement on land.
The notified five-year window closed on 6 August 2025. The Integrated Logistics Policy 2021 is the broader successor on this shelf.
These summaries are prepared from the published policy documents for general guidance only. Scheme rates, ceilings, taluka categories and operative periods are notified by the Government of Gujarat and are revised from time to time. Confirm the incentive currently applicable to your project with us before you file.
Section 02
Reading the Fine Print
Knowing the scheme exists is the easy part. Claiming it is not.
Eligibility turns on taluka category, activity classification and the order in which you register, apply and start construction — get the sequence wrong and an otherwise eligible project is disqualified. We check what your project qualifies for, file the claim, and follow it through the department until the money is disbursed.
Book a Consultation- Which schemes your project qualifies for, across every policy on this shelf.
- The registration-before-execution sequence each scheme requires.
- Applications, TPQA reports and claim pro formas prepared and filed.
- Departmental queries handled through to disbursement.
