Scheme for Assistance to Logistic Park

This scheme's operative period has ended.

The notified five-year window closed on 6 August 2025. The Integrated Logistics Policy 2021 is the broader successor on this shelf.

Issued under Gujarat Industrial Policy 2020, this is the narrower of the two logistics schemes on this shelf — a single capital subsidy for park developers, where the 2021 Integrated Logistics Policy that followed it spans ten facility types and eight incentives. It remains the governing document for claims made during its operative window.

Document record

Operative period ended
Issued by
Industries & Mines Department, Government of Gujarat
Reference
GR No. GID-102020-325568-G
Dated
1 September 2020
Operative period
7 August 2020 – 6 August 2025
Source file
PDF · 7 pages · 3.6 MB

At a glance

25%
Of eligible investment

Excluding land and vehicles

₹15 Cr
Assistance ceiling

Per park

20 ha
Minimum park area

Threshold for eligibility

3 yrs
Completion window

Extendable by 1 year

Eligibility

Who it is for

As the document defines it — the categories of unit the scheme is open to.

  • Industries associations developing a logistics park.
  • Enterprises registered under the Societies, Partnership, Trust or Companies Act.
  • SPVs constituted for the purpose of setting up a logistics park.

The summary

What qualifies as a logistic park

A park developed in a minimum area of 20 hectares, providing infrastructure for logistics services including:

  • Cargo aggregation and segregation, and distribution.
  • Inter-modal transfer of material and containers.
  • Open and closed storage, and ambient condition storage for the transit period.
  • Custom bonded warehouse and container freight station.
  • Material handling equipment, and business and commercial facilities as required for efficient movement and distribution of semi-finished or finished products.

What counts as eligible investment

Capital investment made to create the logistics and infrastructure facilities of the park. The listed facilities are indicative — the SLEC may approve additions based on the needs of the location.

  • Compound wall, internal roads and administrative building.
  • Canteen facilities.
  • Power distribution lines and communication facilities.
  • Water distribution lines and augmentation facilities.
  • Storm water drains, sewage lines and treatment facility, and drainage lines.
  • Common parking for vehicles.

Quantum of assistance

  • Financial assistance at 25% of eligible fixed capital investment, excluding land cost and transport vehicles, to a maximum of ₹15 crore.
  • 100% reimbursement of stamp duty paid on purchase of land required for the project as approved by the SLEC — released only after the total required land is purchased and at least 10% of the infrastructure completed.
  • State and central assistance together must not exceed 60% of project cost; state assistance is reduced to the extent it would be.
  • Reimbursement is proportionate to expenditure incurred, and 15% of the sanctioned assistance is released only after the park is complete.

What does not count

  • Purchase of land and land development.
  • Goodwill fees, commissioning fees and royalty.
  • Preliminary and pre-operative expenses, and capitalized interest.
  • Transportation equipment and vehicles.
  • Technical and consultant fees, and working capital.
  • Anything else the State Level Empowered Committee specifies as non-eligible.

Procedure and completion

  • Register the proposed logistic park with the Industries Commissionerate first — a project already under execution before registration is not eligible for any assistance.
  • After taking 100% possession of the purchased land, apply with a Detailed Project Report and approved layout plan to obtain sanction of financial assistance.
  • The park must be completed within 3 years of the approval letter from the Industries Commissioner; the SLEC may grant up to 1 further year on merit.

Read it in the original.

This summary is a guide to the document, not a substitute for it. The notified text is the operative version.

These summaries are prepared from the published policy documents for general guidance only. Scheme rates, ceilings, taluka categories and operative periods are notified by the Government of Gujarat and are revised from time to time. Confirm the incentive currently applicable to your project with us before you file.

Summaries last reviewed against the notified documents: 6 August 2026.

Before you file

Want to know which of these your project actually qualifies for?

Book a Consultation